Monday, December 15, 2008
Sunday, December 14, 2008
Elephant's Lullaby Online Now!
The Elephant's Lullaby is now up and running on the web!
The Elephant's Lullaby (Flash Animation Version)
Click on the monkey's face where is says "Watch this Movie!"

I'm hoping it will be on YouTube later today!
- Tom
The Elephant's Lullaby (Flash Animation Version)
Click on the monkey's face where is says "Watch this Movie!"

I'm hoping it will be on YouTube later today!
- Tom
Saturday, November 1, 2008
The Elephant's Lullaby Intro
Here's the intro from the Elephant's Lullaby Cartoon. That's me there on the left, with Marika the monkey. I'm teaching the motions to the song.
Artists - Liz McLelland, Wright Rickman, Chris Davidson.
Artists - Liz McLelland, Wright Rickman, Chris Davidson.
Saturday, October 25, 2008
3rd day of filming
We didn't get all the shots we needed from the exterior film shoot with the Garbage Monster on Oct. 10th, so we needed to come back and shoot a few more things. On Oct. 22nd, we went back to my friend Mihal's house to film the ending of the story.
I was a a bit worried that the yard wouldn't look the same. The temperature had gotten much colder, and leaves had fallen off of trees. Things can change fast this time of year.
Luckily, it didn't look too different, in the dark and with the lights set up.
A few things were different about this shoot. It was much colder - about 35 degrees Fahrenheit. On Oct. 10th, I think it was probably about 60 degrees.
The other thing that was different was that Steve Yale-Loehr was not able to be the Garbage Monster again. After asking around a little bit, we couldn't find a suitable replacement. I decided I would try to fill the Garbage Monster's Ginger Ale Shoes myself!
I'm a little shorter than Steve, but I thought it wouldn't be too noticeable. I knew that the original King Kong movie used models that had very different scales from one scene to the next, so that the Gorilla would appear to be 40 feet tall in one scene, and 25 feet tall in another. A couple inches shouldn't make much difference in this case.
It took about 30 minutes to get the costume on. We weren't sure exactly where all the stuff went, but used our best guess. I think when you watch the video, it will be fun to see how the tomato container is on the right arm in one scene, but on the left arm in the scene. But on the other hand, it's supposed to be a pile of garbage. Cans can shift around in a pile of garbage, right?
Erin arrived, all bundled up, and we began shooting. The first thing we did was a chase scene. I chased Erin. Then we switched, and she chased me. I could only see a little out of one eye, so it was a bit challenging. Also, the mask covered my mouth, so I couldn't breathe very well either.
Later, we needed to shoot a scene of the garbage monster emerging from the trash can. Since Erin was small enough to fit in the can, we asked her to put the mask on. She did great!
The final scene was the garbage monster walking down the driveway. Again, Erin was the Garbage Monster. We put the mask on her, and dressed her in an oversize garbage bag, and filmed her walking away from the camera, down the driveway.
We wrapped at 9:15 PM - an early night compared to last time!
We still have a few more shots to catch, but they are interior shots. Then the editing will begin!
I was a a bit worried that the yard wouldn't look the same. The temperature had gotten much colder, and leaves had fallen off of trees. Things can change fast this time of year.
Luckily, it didn't look too different, in the dark and with the lights set up.
A few things were different about this shoot. It was much colder - about 35 degrees Fahrenheit. On Oct. 10th, I think it was probably about 60 degrees.
The other thing that was different was that Steve Yale-Loehr was not able to be the Garbage Monster again. After asking around a little bit, we couldn't find a suitable replacement. I decided I would try to fill the Garbage Monster's Ginger Ale Shoes myself!
I'm a little shorter than Steve, but I thought it wouldn't be too noticeable. I knew that the original King Kong movie used models that had very different scales from one scene to the next, so that the Gorilla would appear to be 40 feet tall in one scene, and 25 feet tall in another. A couple inches shouldn't make much difference in this case.
It took about 30 minutes to get the costume on. We weren't sure exactly where all the stuff went, but used our best guess. I think when you watch the video, it will be fun to see how the tomato container is on the right arm in one scene, but on the left arm in the scene. But on the other hand, it's supposed to be a pile of garbage. Cans can shift around in a pile of garbage, right?
Erin arrived, all bundled up, and we began shooting. The first thing we did was a chase scene. I chased Erin. Then we switched, and she chased me. I could only see a little out of one eye, so it was a bit challenging. Also, the mask covered my mouth, so I couldn't breathe very well either.
Later, we needed to shoot a scene of the garbage monster emerging from the trash can. Since Erin was small enough to fit in the can, we asked her to put the mask on. She did great!
The final scene was the garbage monster walking down the driveway. Again, Erin was the Garbage Monster. We put the mask on her, and dressed her in an oversize garbage bag, and filmed her walking away from the camera, down the driveway.
We wrapped at 9:15 PM - an early night compared to last time!
We still have a few more shots to catch, but they are interior shots. Then the editing will begin!
2nd day of filming
The Garbage Monster music video has two main parts: "the story," with the recycling kid and the garbage monster filmed outside at night, and "the concert," with me, Tom Knight, playing guitar to an audience who is singing along.
On October 20th, 2008, we filmed the concert part of the video at the Ithaca Sciencenter.
Annie Zygarowicz had created a cool set, which consisted of an arch made entirely of recycled bottles and cans. It was very festive and colorful.
I was wearing my costume made by Amelia Rosenthal - the necktie vest and porkpie hat.
We arrived at the Sciencenter around 9:30 AM so Photosynthesis Productions could get the lights and cameras set up. Then we began shooting a lot of close-ups of me singing the song over and over. I had to make funny faces, wink at the camera, and try to remember the spoken words in the middle of the song. They shot some close-ups of my left hand playing the guitar, my right hand playing the guitar, and my feet tapping. This went on for a couple hours or so. It was actually kind of fun.
After a short lunch break with delivery from Taste of Thai Express, we were ready to bring in the kids. About 25 kids from Ithaca (and surrounding towns) had been invited to be in the video, along with a few parents.
We set everyone up sitting on the floor in front of me, much like a typical concert, and I sang the song about 10 times. Everyone else sang it too. We took a break at one point to dance to the Wiggle Worm song.
The director Meg Doherty did a great job keeping everything fun and engaging for everyone. David and Billy and Garth kept the cameras working, and moved lights when necessary.
Before the film shoot, some kids met with us at the Sciencenter to make "garbage monster puppets," which are monsters made out of garbage and recycled materials. We passed out these puppets and the kids held them up and danced around with them.
We wrapped up around 7 PM. We only needed about 2 minutes of good film, and we had shot about 2.5 hours worth! I knew we had plenty of great shots to choose from. We'll see what happens with the editing!
All photos are by Billy Boyce. Thanks Billy!
Thursday, October 16, 2008
Tom's new costume
Subscribe to:
Posts (Atom)
